The load calculation sets the price before anything else does
A contractor has to work out how much heat the house actually gains in a day, room by room, window by window. That calculation decides the tonnage, and tonnage drives almost everything else on the quote: the size of the compressor, the size of the coil, how much the line set and ductwork have to handle. Skip this step and the price might look lower, but the wrong size unit costs more to run and wears out faster.









